Fifty-six tons of methane — a potent greenhouse gas — entered the air over Northampton County in 2015, and that amount could increase if a compressor station is built there as part of the Atlantic Coast Pipeline. Co-owned by Dominion Energy and Duke Energy, the controversial $5.5 billion project would pipe natural gas from a fracking ...
The post A long night ahead in Garysburg: Public hearing on Atlantic Coast Pipeline air permit appeared first on The Progressive Pulse.